PROJECT EXPERIENCE SECTION OF THE QSTI APPLICATION - EXAMPLE - For those persons who have taken the exam (or plan to) and are preparing their applications for submittal to the QSTI Review Committee, the project experience section may prove a little open-ended. What are “they” looking for? How much information should I include? Do “they” want a copy of a test report? First, definitely do not send in any test reports. The committee is not equipped to handle such confidential business information. What the committee does need is information about your experience and knowledge sufficient to demonstrate that you can conduct a test project successfully and produce reliable results. As a guideline for completing this element of the application, the QSTI Review Committee has provided two examples for your use. The components of these examples coincide with those outlined in the SES application form. Group II Application (example 1) Project One EPA Method 7 I led a project to measure NOx em
TVA-1000B Toxic Vapor Analyze
The TVA-1000B Toxic Vapor Analyzer, illustrated in the figure below, is an advanced-design, portable, organic/inorganic vapor monitor for the gas survey industry. This analyzer useseither a flame ionization detector (FID), or a photoionization detector (PID), or both types of detectors to sample and measure concentration of gases.
The vapor concentration may be read immediately on either of two displays — one mounted directly on the hand-held sample probe and the other on the instrument sidepack itself. Vapor
concentration can be displayed on both displays in parts per million (ppm), parts per billion (ppb), or percent concentration (%). The data displayed may also be collected and saved in
analyzer memory and downloaded to a personal computer for analysis.
Through the sidepack keyboard, you can choose the mode of operation, select concentration
units for the display, set alarm thresholds, select data collection mode, and change setup (configuration)
parameters.
This unit is shipped with the battery installed. The unit is ready for operation upon completion
of setup, calibration, and charging.